Moonee Creek Stormwater Quality Strategy
Urban Stormwater Runoff Treatment
Purpose
To treat urban stormwater runoff sufficiently to maintain pre-development water
quality through the use of the proven computer modelling program: Model for Urban
Stormwater Improvement Conceptualisation (MUSIC).
Objectives
- To achieve a neutral scenario with respect to water quality leaving the site
post-development;
- To meet Coffs Harbour Council's objectives in its Urban Stormwater Management
Plan (USWMP) 2000;
- To select treatment measures integrating Water Sensitive Urban Design (WSUD)
objectives of bio-engineering strategies;
- To obtain optimal water quality results;
- To minimise impacts of urban stormwater on aquatic ecosystems, public health
and amenity.
Industry Partners
- Innovation Planning Australia Pty Ltd
Outcomes
- A design which incorporates a series of stormwater controls including household
rainwater tanks, swales, bioretention systems, a Gross Pollutant Trap and a wetland,
all implemented to minimise the impacts to the environment from urban pollution.
Project Facts
- Project Tasks
- Stormwater Quality Modelling and Development of Treatment Train, Report
Preparation and Concept Layout.
- Challenges
- Developing a strategy that is site sensitive, cost effective, and easy to
maintain.
- Contact
-
Robert McGuinness, Director, Innovation Planning Australia
Ph: (02) 4730 6830
| home |
|